Best price 3.9mm full color LED video wall on sales

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-23 06:42

  • Browse the number:

    65

Send an inquiries
Company Profile
Shenzhen LongRun LED Optoelectronic Co.,Ltd
Contactaixin:

longrunled(Mr.)  

telephone:

(86 755) 61933999 Ext:907

Arrea:

Beijing

Address:

Area B, 2/F, Building C, No.6, Tangwei Community Industrial Avenue, Baoan, Baoanqu, Shenzhen, Guangdong, China (518103)

Website:

http://longrunled.china-asia.com/

Product details

Model Number: 3.91mm full color LED video wall Brand Name: LONGRUN 130 Key Specifications/Special Features: FeaturesLight: cabinet size 500x500x80mm, and weight 8kg/pc, only one hand can hold it, assembly time savedThin: die-cast aluminum design, high intensity, high tenacity, high precision, unchangeable, 80mm as the thickness, normal cabinet is >130mmFast: fast locks on the four edge of the cabinet, only 180° rolling will lock the closed two cabinets with high precisionEasy to assemble and disassemble the cabinets, fast, reliable and beautiful, it means true quick-assemblingEasy: modular design, easy to assembly and maintainCapacity: new design with exclusive cabinet, suitable for P3.91, P4.81 or moreLow: wonderful design for natural heat releasing, no need for fans or air-conditioner, low noise, low structure cost because of the lightweight of cabinets, low power dissipation, more cost savedMaterials and advantages:First-class LED chip:Epistar from TaiwanWith pure golden wireconnection in LEDGrand A row materialfor module frame and mask
4 layers PCB and copper plating thickness >18mil
Ag alloy solder pasterto ensure good soldering on PCB
Stainless steelscrews when assembly
Long-term brightness capacity throughout product lifespan
Three years warranty
Shipping Information:
  • FOB Port: Shenzhen
  • Lead Time: 3 - 7 days
Main Export Markets:
  • Asia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe

Download more information about this product